Following is the Z type material elevator installation steps:
Step 1: Check all necessary marked parts.
Step 2: Connect some small pieces first as per sign for the vertical sheet.
Step 3: Install the vertical sheet and fix all screws.
Step 4: Install the top side of vertical sheet.
Step 5: Install the both horizontal sheet and fix all screws.
Step 6: Install all top gear and fixed mount
Step 7: Loose the bottom gear before install the elevator chain (Key point).
Step 8: Install 1st chain to make every part into the correct position and lock it.
Step 9: Make sure the 2nd chain has a balance degree as 1st chain before installation (key point).
Step 10: Start to install 2nd chain from the exact fixed position,if the chain is not long enough to lock,adjust the bottom screw,then lock it.
Step 11: Finished 2pcs chain installation; test and check both chains if loose; If loose,adjust the bottom screw to tight (key point).
Step 12: Turn the chains by hand to check if everything works well.
Step 13: Install 1pc hopper to turn a round again to check everything.
Step 14: Install all hopper and check everything again.
Step 15: Lock the bottom gear , then cover all parts and fix all screws.
Step 16: Install side cover and fix screw.
Step 17: Install top hopper and cover,then check all screws.
Z Type Material Elevator Installation Finished